Yesterday was a good day for the construction of the second floor on the MEI school. There where six rows of block laid on the two outside walls!
Here are some pictures of guys mixing the concrete on the ground and then placed in a bucket and then passed to several people in "assembly line" up to the second floor.
No comments:
Post a Comment